Having already worked on two stores with G-Star, we were asked to produce their new store in Sheffield’s city centre. Our role was to work closely with G-Star’s in house architecture team to ensure that all design elements were carried out as intended. By pulling together our multi skilled team of contractors we were able to provide G-Star with a complete and well-crafted store including a 200 sqm polished concrete floor with 4 metre oak finished changing rooms.

  • gstar_002

    http://www.93ft.com/wp-content/uploads/2009/11/MG_5647_reduced-599x400.jpg

    gstar_002
  • gstar_003

    http://www.93ft.com/wp-content/uploads/2009/11/MG_5654_reduced-599x400.jpg

    gstar_003
  • gstar_001

    http://www.93ft.com/wp-content/uploads/2009/11/MG_5648_reduced1-599x400.jpg

    gstar_001
  • gstar_006

    http://www.93ft.com/wp-content/uploads/2009/11/MG_5656_reduceda-599x400.jpg

    gstar_006
  • gstar_004

    http://www.93ft.com/wp-content/uploads/2009/11/MG_5651_reduced1-599x400.jpg

    gstar_004
  • gstar_007

    http://www.93ft.com/wp-content/uploads/2009/11/MG_5657_reduceda-599x400.jpg

    gstar_007
  • gstar_008

    http://www.93ft.com/wp-content/uploads/2009/11/MG_5659reduced-599x400.jpg

    gstar_008
  • gstar_009

    http://www.93ft.com/wp-content/uploads/2009/11/gstar_009-599x400.jpg

    gstar_009